Top

VR Tours: New Blazier Relief

The New Blazier Relief School modernization team has assembled VR Tours using design renderings from the Design Development Phase of the modernization process.

These VR Tours are intended to showcase the vision and Schematic Design Drawings created by both the school’s Campus Architectural Team (CAT) and Design Team.

The Austin ISD 2017 Bond was designed to modernize or construct new campus facilities. This bond is an investment in AISD facilities, teachers and staff, and our students. Student success is the ultimate goal and driving force. 

See this school’s design rendering VR Tour below: New Blazier Relief