Top

Video Tour: Bowie High School

The Bowie High School modernization team has assembled a video tour using design renderings from the Design Development Phase of the modernization process.

This video tour intends to showcase the vision and Schematic Design Drawings created by both the school’s Campus Architectural Team (CAT) and Design Team.

The Austin ISD 2017 Bond was designed to modernize or construct new campus facilities. This bond is an investment in AISD facilities, teachers and staff, and our students. Student success is the ultimate goal and driving force. See the school’s design rendering video tour below: