Casis Elementary School

Casis Elementary School opened in 1951 as a model for collaborative design among public schools in the post-World War II era. The school successfully integrated primary education programs with an advanced special education program within a single public-school campus. Casis Elementary received a full modernization as part of the 2017 Bond Program. 

The school’s connection to the neighborhood and natural environment a treasured parts of the original building. With this feedback from the community, AISD created a “school within a forest” that championed the Casis tradition of connecting with nature. 

Many parts of the new school are inspired by its history, so it still feels like the Casis you know and love, but designed for a modern era. When you walk through Casis, you’ll see a clear link to nature in nearly every space — from the outdoor classroom overlooking Casis Forest, to the rooftop fitness deck and even the colors of the walls. Each classroom has flexible furniture that can be rearranged to best suit the learning material and each student’s learning style. Additional collaboration spaces provide teachers visibility while giving students the space for independent work. 

The school features a connected cafeteria and gym, library with a reading den and a community room that can be used by the Casis community. Casis Elementary was also built with a wide range of sustainable features, including water-saving fixtures, ample natural light, native and adapted landscape plants, and recycled construction material. While the building has been transformed, the passion for nature and community connection remains the same.

Project Timeline

*Timeline and rendering subject to change

Latest Updates

Casis Elementary: Full Modernization

As part of the 2017 Bond Program, Casis Elementary School received a fully modernized campus that opened to students in Fall 2022. The new building…

Read more

Marshall Middle School Grand Opening Recap

Austin ISD celebrated the grand opening of the new Dr. General Marshall Middle School in Northeast Austin on October 4. The campus opened in Fall…

Read more
2017 Bond Targeted Projects

Watch Our Video about the 2017 Bond Targeted Projects

As part of the 2017 Bond Program, Austin ISD has been addressing campus-level deficiencies throughout the district. Why it matters: The district identified over $4…

Read more

Key Information

  • Modernization Budget: $35,150,000
  • Total Budget: $35,216,000
  • Opening Date: August 15, 2022
  • Trustee: Lynn Boswell
  • Location: 2710 Exposition Blvd., Austin, Texas 78703
  • Existing Capacity: 669
  • Planned Capacity: 870
  • 2016/2017 Utilization: 122%

Project Team

  • Architecture & Engineering Team:
  • Construction-Management-at-Risk Team:
  • Campus Architectural Team:
    • Samuel Tinnon, Principal
    • Elexa Antwell, Instructional Staff
    • Courtney Ewing, Instructional Staff
    • Andrea Rieck, Instructional Staff
    • Marissa Rosenstein, Instructional Staff
    • Cameron Campbell, Parent
    • Heather Chesney, Parent
    • Kimberley Comstock, Parent
    • Dana Hogstedt Arnold, Parent
    • Revis Ray Joiner, Parent
    • Tadd Lanham, Parent
    • Lindsey Majors, Parent
    • Laura Spence, Parent